Skip to main content
The first hard DPP deadline is February 18, 2027, in -- days. Your sector's date is on the timeline below. Find your date

Digital Product Passports, built from the data you already have

Data Graphs turns your ERP, PLM and PIM records, spec sheets, declarations and supplier spreadsheets into signed, registry-ready passports. A complete solution for the entire DPP lifecycle from creation to publication in any product sector.

SOC 2 Type 2 certified Independently audited
GS1 Switzerland Solution partner
First hard deadline · battery passport
February 18, 2027

Fixed in law

Every EV battery, every light means of transport battery, and every industrial battery above 2 kWh. Art. 77, EU Battery Regulation.

Every in-scope battery needs a passport from day 1.

--
Days
--
Weeks
--
Months

Then magnets in May 2027. Steel, then textiles, in the first ESPR wave. Construction separately, under the CPR.

In production with
Syngenta CropLife Europe Corteva AgriGuide
Partner GS1 Solution Partner
27
EU member states in production
24
Languages served

The reason to wait expired in July.

Three things happened in one week.

July 15, 2026

Six DPP standards cited in the Official Journal

Implementing Decision (EU) 2026/1736. Conformity gives a presumption of conformity with ESPR Articles 10 and 11, to the extent the standards cover them.

July 20, 2026

The EU Central DPP Registry went live

Registry, test environment and guidelines. Implementing Regulation (EU) 2026/1778, in force since August 6, sets out how you register, not when. For batteries, that is February 18, 2027.

Before you can register

Operator verification takes time

You cannot register a passport until your organization is verified as an economic operator. Verification runs through a third party, so it carries a lead time. Start it well before the date you need it.

Want to see it work on your data?

Upload your documents. Watch Data Graphs build the passport.

Data Graphs AI reads your product documentation in whatever format it arrives, maps the values to your category schema, and reports which fields are still outstanding.

Ingest

What you already have

Product data sheetsSpec sheetsEPDs & LCAsDeclarations of performanceSafety data sheetsTest reportsSupplier spreadsheetsPDFs

Plus direct API connections to ERP, PLM, MDM and PIM.

Structure

Data Graphs AI

Extract Reads values out of unstructured documents
Map Matches them to your category's schema
Reconcile Resolves conflicts against the system of record
Report gaps Lists the fields outstanding, and who holds them
Publish

Signed passport

Schema conformant EN 18246 signature Securely Hosted GS1 Digital Link GS1 Registry & Discovery Service EU Central DPP Registry QR ready to print

Verified on every retrieval, before anything is displayed.

Your existing documentation is enough to start.

A passport a regulator can verify and a customer can read

Every published passport carries the same six things, whatever the product category. The schema decides which fields go inside them; the platform handles the rest.

Product identity

GTIN, model, batch or serial, manufacturer

Environmental data

Lifecycle impact, carbon footprint, recyclability

Compliance & performance

Declarations, safety data, hazard classifications

Cryptographic signature

EN 18246 compliant, checked on every retrieval

Supporting documents

Linked from the passport itself

Registration

GS1 Discovery Service and the EU Central Registry

Digital Product Passport
Product name
Manufacturer · GTIN 07612345000012
Digitally signed · Verified
Overview Environment Compliance Docs
Product identifier GTIN + batch
Material composition Declared
Carbon footprint Per EN 15804
Substances of concern None declared
Repair & end of life Instructions
EU registration ID Present
Declaration of performance EPD Safety data sheet Test report
Resolved via GS1 Digital Link · verified at retrieval · each audience sees the view it is entitled to.

Four reasons to run your passports on Data Graphs

01 / Provenance

Every value traces to its document

Ask questions of your product data in plain language. The answer shows the source document behind each fact.

02 / Any source

Your data, wherever it lives

ERP, PLM, MDM and PIM through APIs. Spec sheets, EPDs, declarations and supplier spreadsheets through Data Graphs AI.

03 / Before the audit

Errors surface while you edit

Schema validation runs as you work, and you preview the passport exactly as a customer, distributor or regulator will see it.

04 / One model, many views

The next obligation is configuration

Signed, hosted and registered with GS1 and the EU registry. JSON and HTML come from the same record.

From scattered systems to a registered passport, in weeks not months

01 · Model

One definition of the product

Your systems and your documents reconciled into one governed foundation. This is the step a template tool skips.

02 · Validate & sign

Conformance, then signature

Validated against the GS1 Keystone rules for your category, then given an EN 18246 compliant cryptographic signature and checked on every retrieval.

03 · Publish & register

One action, three places

Hosted, resolvable through GS1 Digital Link, and registered with the EU Central DPP Registry under Reg (EU) 2026/1778.

04 · Evolve & audit

The next obligation is a view

Versioned, audit-ready records as products change. The next regulation is another view of the same foundation.

Built for your sector without being rebuilt for it

The foundation is the same whatever you make. Your category's own rules, language and data sit on top of it, so construction chemicals, batteries, magnets, fasteners, lighting and crop protection all run on one thing. Pick yours and the assessment starts there.

The DPP calendar, as it actually stands

Obligations accumulate on the same physical product. Your nearest date sets the date you start.

  1. February 18, 2027
    Battery passport Reg (EU) 2023/1542 Art. 77. Every EV battery, every light means of transport battery, and every industrial battery above 2 kWh. Lands on whoever places the battery on the EU market, not the cell maker. Fixed in law.
  2. May 24, 2027
    Permanent magnets CRMA Reg (EU) 2024/1252 Arts. 27 and 29. Any magnet over 0.2 kg in the assembly. Motor, pump, drive and appliance makers. Delegated act pending.
  3. 2027–2029
    Iron and steel, then textiles, tires and aluminum First ESPR delegated acts, expected 2026–27. Compliance roughly 18 months after adoption.
  4. Q4 2027 onward
    Construction products Reg (EU) 2024/3110 has applied since January 8, 2026, with penalties from January 8, 2027. The passport arrives per product family: standards and act expected Q4 2027, compliance 2028–29.
  5. September 23, 2029
    Detergents and surfactants Reg (EU) 2026/405, on a 42-month transition. Set in law.
  6. 2029–2031
    Furniture and mattresses Delegated acts expected from 2028.
Sources: published EU regulation, the ESPR working plan and the First CPR Working Plan 2026–2029. Anything marked pending is not yet adopted.

Three ways companies do this

Which one fits depends on the width of your catalog, how many regulations land on it, and where your product data sits today.

Template tool
A few hundred a month
  • A small, stable catalog under one obligation
  • Data entered by hand, product by product
  • Each new regulation starts again
  • Cheapest while the scope stays narrow
Build in-house
A platform team, long term
  • Companies already running a product data platform
  • You own the model, the schemas and every update
  • GS1 and EU registry integration is yours to maintain
  • Maximum control, at the cost of a standing team
Data Graphs
Live in production today
  • A broad catalog with more than one regulation on it
  • Modeled once. Each regulation becomes a view
  • GS1 and EU registry integration ships with it
  • Signed, hosted and audit-ready from the first publish
  • Onboarding in weeks, with our team alongside

A template tool cannot fix a missing foundation.

Free · 5 minutes · scored on submission

Take the DPP Readiness Assessment

Eight questions about your portfolio, the obligations you already know about, and where your product data sits today. You get a readiness score, an indication of which regulations are likely to reach your products and when, the gaps worth checking first, and a recommended next step.

Answers before you talk to us

Is my data secure?
Yes. We take data security very seriously. All data is encrypted at rest. The Data Graphs platform undergoes regular penetration testing, is continuously monitored for threats, and is SOC 2 Type 2 certified by an independent third-party AICPA-accredited auditor.
Is my data used for training AI models?
No. Your data is not used to train AI models and it is not sent to public AI services for processing. The models run privately on the Data Graphs platform.
What if a lot of our product data sits outside a system?
That is the normal starting point, and it is what Data Graphs AI is for. It reads spec sheets, spreadsheets, declarations and test reports, maps the values to your schema, and lists what it could not find and who holds it.
What if we can't fill every field yet?
Annex XIII does not have to be complete by February 2027. The schema has to exist and be connected to the registry. Build the model now and fill it as supplier data arrives.
How long does onboarding take?
A first product line publishes in weeks. Full portfolio deployment runs a few days to a few weeks depending on how many systems your data spans. Supplier data collection is usually the longest part.
Doesn't our PIM or PLM already hold this data?
PIM and PLM store product data, and Data Graphs reads from both. A passport also needs one reconciled definition of the product across ERP, BOM, CAD and supplier declarations, plus a signed, registry-resolvable output. That is what Data Graphs adds.
What happens when the requirements change?
Schemas are configuration on top of the product model. When a delegated act or a GS1 dictionary changes, the schema updates and downstream passports follow. A second regulation becomes another view of the same data.

See which regulations are heading for your portfolio

Eight questions, five minutes. A readiness score, an indication of your nearest enforceable date, and the gaps worth checking first.